Hi Everyone

The sun is out at last and the new DC in Northampton is entering the final stages of the build. A lot of the work going on at the moment is cosmetic (most of the infrastructure work is complete), but it's this that makes the biggest visual difference to how "finished" the building looks

This week the landscape people have flattened the area in front of the building and laid the paths, turf and are starting on the customer parking area. Inside, the office areas are being decorated and furniture is being installed (I wouldn't fancy building dozens of flat pack desks for a living, I can tell you). We'll be kitting out the NOC and other offices over the next couple of weeks.

On the DC side of things we've installed the Gas Suppression system now, along with a lot of the Aircon pipework and other bits of infrastructure.

Here's some of the latest site pictures

Rik

 